![]() of 18ĩ Now you need to setup the PLCSQL Link to match the Configured SQL database. RT Simulation Start Page: Errors are listed in the Status field. You can now run the application in demo mode for commissioning and test. of 18Ĩ After this click Start Simulation. Open Device Configuration to setup the IP address for the HMI, to connect HMI to the same network as the PLC. In this case we choose to run the application PLCSQL_HMI1200, in order to setup the PLCSQL Link. The same you need to do under Screens and Tags for HMI, In this case you need to reconnect Tags. You need to open 2 instances of TIA and copy the PLCSQL-Link under Program Blocks to your own project. This way, the setup interface for PLCSQL Link, has been created for you. The pages from these examples can freely be copied into your own user panel. PLCSQL_HMI1200: Is suitable for using the KTP 400 Panels PLCSQL_HMI1500: Is suitable for using the KTP 400 Panels HMI_1: Is designed for 10" screen panels, MP277. of 18ħ Setup of the PLC is done through the HMI interface, for this we have created 3 example panels. of 18Ħ Copy the whole program folder, from one of the example programs and replace the program folder in your new station or continue working on one of the sample stations. Compile it, and download the configuration to the PLC. Set up the hardware configuration, Set IP address for the Ethernet port. Create your own station, with the respective PLC you are going to work with, you might want to create it in a separate project. Here you ll find 2 PLC projects, The program of these two stations are identical, and can be used with e.g. Start by retrieving the delivered TIA Example project PLC_SQL_M2.03_V12_SP1. The HMI is optional and not required for operation, but might help during commissioning to see status and test the system. Bot manuals are available for download from of 18Ĥ Software requirements This example project is based on following software tools: PLC Program: Siemens Tia Portal V.12 HMI: Siemens Tia Portal V.12 of 18ĥ Setting up PLCSQL Link This chapter takes you through the process of creating your own PLC station and HMI interface for setting up PLC link to connect with the SQL database. Have you chosen to operate the PLCSQL link, together with MySQL server? You also need to follow tutorial MySQL Installation Manual. Have you chosen to operate the PLCSQL link, together with Microsoft SQL server? You also need to follow tutorial MS SQL Installation Manual. But in order to get it to work out-of-the-box, it is important to setup the Database, to fit with the design for PLCSQL link. 1 Installation Manual PLCSQL link SQL Client in a Siemens S7 PLC Revision date: Revised by: Anders Jorsal, Automatic Syd A/S Version: 1.01Ģ Contents INTRODUCTION 3 SOFTWARE REQUIREMENTS 4 SETTING UP PLCSQL LINK 5 LOG VALUES 12 SQL CONTROLLER 14 CHANGE LOG DATA ARRAY LENGTH 16 of 18ģ Introduction You can operate the PLCSQL link with different databases.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |